Étude de cas : Project. Recherche parmi 300 000+ dissertationsPar soukpafolo • 28 Avril 2020 • Étude de cas • 329 Mots (2 Pages) • 448 Vues
Soukpafolo Ismael Kone
Steven Carnovale
ISQA410
Case Study #2 (Rougir)
- What are the costs for producing the three products in-house?
Raw material costs:
Purified water: 1$ per pound
Oil: 1.50$ per pound
Color and scent: $3 per pound
Emulsifiers: $2 per pound
Labor costs:
First shift ($8.50/hour)
Stage1: $8.50 per hour
Stage2: $9.25 per hour
Second shift 10% reduction in capacity and a 10% increase in wage rate
Stage 1: (0.1*8.50) – 8.50 = $7.65
Stage 2: (0.1*9.25) – 9.25 = $8.325
- Develop a linear programming model for this problem.
Since the company seeks to minimize the expenses, let’s Z be the objective function
The linear programming model for this problem can be describe as:
Z = (cost of labor + cost of raw material) (F + B + C)
Decision variables:
F: number of units of face cream
B: number of units of body cream
H: number of units of hand cream
Subject to constraints are:
1.5F + 1.8B + H
0.8F + 6B + 0.5H
8F + 6B + 7H
F + 3B + 2H
0.5F + 0.3B + 0.4H
0.5F + 0.7F + 0.6H
F >= 12000
B >= 8000
H >= 18000
AND F,B,H >= 0
What production schedule minimizes total cost including outsourcing, and what is the corresponding value of the objective function?
...